Optimum Pembroke Pines Concrete CompanyOptimum Pembroke Pines Concrete Company

Concrete floor installation in Pembroke Pines FL - a slab ready for your flooring

Old floor cracked, uneven or sinking? We pour a new, level slab and give it time to dry before tile or a coating goes on.

Services
16
Service areas
12
Rectangular swimming pool with a pale concrete deck, lounge chairs, and a stone retaining wall below landscaped trees.

Get an estimate for your concrete floor

Seeing the ground and the room in person is how I give you a real number.

Request an estimate

What does a new concrete floor involve, and what sets the price?

Concrete floor installation in Pembroke Pines means our crew places a new slab, usually tied together inside with rebar steel or wire mesh, then finishes it, cuts its joints and lets it cure. You end up with a floor you can use as it is or cover with a coating, tile or other flooring. The pour takes up one day of the job, and the waiting afterward usually decides when you can use the room.

Most people call me because an old floor is cracked, uneven or sinking, or because they're adding a room or redoing a garage floor. The price moves with the size of the room, how thick the slab has to be for what it will carry, whether it's reinforced, and how much digging and packing the ground needs before we pour. The schedule turns mostly on waiting, first for the concrete to cure and then, if flooring goes on top, for the slab to dry out. When I come out, I walk the job with you and explain what's in the price, so you can see where your money goes before you decide anything.

How we handle concrete floor installation

We start under the slab, because that's where most floors fail. Our crew digs out soft dirt and packs the subgrade, the ground the slab sits on, so it doesn't settle later and take the floor down with it. Then we set the forms and the steel, and we pour early in the day, since midday heat can leave a weak, dusty top. Once the surface is finished, we cut control joints, shallow lines that give the slab a planned place to crack, before it picks its own spots, and then we keep it damp and covered while it cures, the slow stretch when concrete gains its strength. If flooring or a coating is going on top, I plan the schedule around letting the slab dry out first. I'd rather you wait a bit than watch glue or tile let go later. If the budget gets tight, I'll tell you to save on the finish before the base, because you can redo a surface but you can't fix what's under a slab without tearing it out.

A new floor often connects to other work around the house. If the room opens onto the back yard or the pool, we build concrete pool decks that tie into it, and where the floor sits higher than the ground outside, we can add concrete steps at the door so getting in and out is easy.

Concrete floor installation permits in Pembroke Pines

The city's Engineering Division issues engineering permits for construction on private property, and its list names excavation, fill and sidewalks but not concrete floors, so that list alone doesn't tell you whether your floor needs a permit. Your own project is a question for the city's Building Department, and if it's unclear, we check with them before anything starts. When a permit is needed, we take care of the application and the paperwork as part of the job, through the city's online Development Hub or in person at their office. On inspection day the city wants a printed permit card and the approved plans on site, so we make sure both are there when the inspector shows up.

A lot of the floor calls we get here come from additions, garage conversions and rooms where the old slab has cracked or dropped. The same summer heat and afternoon storms show up on jobs in Miramar and Davie, so we start pours early and watch the sky before the truck is called.

Why call us for your floor

  • I walk your job myself

    I come out to look at your floor before anything gets priced, and I'm on site with our crew when the work happens. The person who explained the plan to you is the same one making sure it gets followed.

  • Started on crews, opened in 2023

    I spent every summer through school hauling, setting forms and finishing on concrete crews until I could run a pour myself, and I started this business in Pembroke Pines in 2023. Those years taught me that the steps nobody sees decide how a slab holds up.

  • Fully licensed and insured

    Pembroke Pines asks contractors who register to work in the city for a state or Broward County license, general liability insurance and workers' comp insurance. Ask anyone you're comparing to show you those before you sign.

Phone
(954) 676-1352
Hours
Mon–Fri: 8 AM–9 PM, Sat–Sun: 6 AM–9 PM
Location
Pembroke Pines, FL 33025

If you're planning a floor, send me the room size and what's going on top, and I'll set up a time to walk it with you.

Get a free estimate for your concrete floor

We reply within one business day. Estimates are free and done at your property, with no pressure and no obligation. Once you send the form, we'll set a time, and I'll come out and walk the room with you, so it helps to include the room size, what the floor will carry and any flooring planned on top.

Location
Pembroke Pines, FL 33025
Hours
Mon–Fri: 8 AM–9 PM, Sat–Sun: 6 AM–9 PM
Credentials
Fully licensed and insured.

Frequently asked questions

How much does a concrete floor cost in Pembroke Pines?

Concrete slab work in the Fort Lauderdale area, before any staining or stamping, usually runs about $6 to $12 per square foot. That's the area's going rate, not our price, and reinforced slabs with rebar or wire mesh cost more per square foot than plain pads. Your own number comes from the estimate, and we cover Pembroke Pines and the cities around it in Broward and Miami-Dade.

How long after a concrete floor is poured can I walk on it?

You can usually walk on a new slab within 48 hours, though concrete takes about a month to fully cure. To be safe, plan on waiting a week before heavier loads go on it.

Will a new concrete floor crack?

It can, because today's methods reduce cracking and curling, where slab edges lift slightly, but can't remove them, even with the best design and careful work. Anyone promising a floor completely free of cracks is promising more than concrete can deliver. A well-built slab sends most cracks into the joints we cut, and our work is backed by our satisfaction guarantee.

How long do I wait before putting tile or a coating on new concrete?

You wait until the moisture inside the slab drops to an acceptable level, which is a separate wait from the cure. Flooring or a coating that goes down too soon can trap that moisture and lead to blistering, buckling, glue that lets go, or mold. That's the wait I plan for, so it's on the calendar from the first day.

How do I choose a contractor for a concrete floor in Pembroke Pines?

Ask how they schedule finishing, jointing and curing on pour day, because poor timing there can lead to cracking, dusting, scaling, high or low spots and poor drainage. If flooring will go over the slab, also ask how they plan the vapor retarder, a moisture barrier under the concrete. It protects floor coverings best when it sits right against the slab, but that setup takes extra care to get right.

How thick should a concrete floor be for a garage or workshop?

A slab that carries a garage, a shed or heavy vehicles should sit at the thicker end of the usual range, according to one Fort Lauderdale cost guide. Tell me up front what the floor will hold, so the thickness and the steel are planned for it from the start.

  • Concrete pool decks

    When your new room opens onto the pool, a deck poured to match gives you one continuous surface outside and can be sloped so water runs away from the doors.

  • Concrete steps construction

    A finished floor often ends up higher than the yard or the garage, and solid concrete steps at that doorway make the drop easy to handle every day.

(954) 676-1352Request an estimate